Solar farm

Lehma solar farm

Lehma solar farm is a solar farm in Germany with a capacity of 2.3 MW, commissioned in 2011. It is operating.

In 2024 it settled 2.5 GWh of electricity, a load factor of 12.4%. That volume was settled under EEG support.

Capacity
2.3 MW
Country
Germany
Status
operating
Commissioned
2011
Owner
Technology
PV
Measured output 2024
2.5 GWh
Load factor
12.4%

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled. All Germany assets

CapexAtlas|ScreenerMap