Solar farm

HW NO SB Dach solar farm

HW NO SB Dach solar farm is a solar farm in Germany with a capacity of 2.7 MW, commissioned in 2011. It is operating and is owned by HW Immobilien GmbH & Co. KG Nord.

In 2024 it settled 2.0 GWh of electricity, a load factor of 8.4%. That volume was settled under EEG support.

Its EEG support runs to the end of 2031, after which that output is sold at market prices.

Measured performance vs peers
8.4%
This assetCohort median 10.5%Middle half

This asset produced at 8.4% of nameplate in 2024 — the 12th percentile of German solar commissioned 2010-2014 (2,063 assets with metered output).

Capacity
2.7 MW
Country
Germany
Status
operating
Commissioned
2011
Owner
HW Immobilien GmbH & Co. KG Nord
Technology
PV
Measured output 2024
2.0 GWh
Load factor
8.4%
EEG support ends
2031
Peer percentile
12th
Grid connection
MS
State
Mecklenburg-Vorpommern

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE961656550335); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets