Solar farm

Höheischweiler solar farm

Höheischweiler solar farm is a solar farm in Germany with a capacity of 1.4 MW, commissioned in 2013. It is operating.

In 2024 it settled 1.2 GWh of electricity, a load factor of 9.4%. That volume was settled under EEG support.

Capacity
1.4 MW
Country
Germany
Status
operating
Commissioned
2013
Owner
Technology
PV
Measured output 2024
1.2 GWh
Load factor
9.4%

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled. All Germany assets

CapexAtlas|ScreenerMap