Solar farm

Gewerbepark II solar farm

Gewerbepark II solar farm is a solar farm in Germany with a capacity of 1.1 MW, commissioned in 2013. It is operating and is owned by m3s-Solar GmbH.

In 2024 it settled 730 MWh of electricity, a load factor of 7.6%. That volume was settled under EEG support.

Its EEG support runs to the end of 2033, after which that output is sold at market prices.

Measured performance vs peers
7.6%
This assetCohort median 10.5%Middle half

This asset produced at 7.6% of nameplate in 2024 — the 7th percentile of German solar commissioned 2010-2014 (2,063 assets with metered output).

Capacity
1.1 MW
Country
Germany
Status
operating
Commissioned
2013
Owner
m3s-Solar GmbH
Technology
PV
Measured output 2024
730 MWh
Load factor
7.6%
EEG support ends
2033
Peer percentile
7th
Grid connection
MS
State
Nordrhein-Westfalen

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE929267987131); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets