FWKK1 solar farm is a solar farm in Germany with a capacity of 3.5 MW, commissioned in 2013. It is operating and is owned by Marco und Michael Göbel PV Feuchtwangen GbR.
In 2024 it settled 895 MWh of electricity, a load factor of 2.9%. That volume was settled under EEG support.
Its EEG support runs to the end of 2033, after which that output is sold at market prices.
This asset produced at 2.9% of nameplate in 2024 — the 1st percentile of German solar commissioned 2010-2014 (2,063 assets with metered output).
Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE970989503741); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets