Fürstenwalde Süd (V) solar farm is a solar farm in Germany with a capacity of 4.1 MW, commissioned in 2016. It is operating.
In 2024 it settled 3.4 GWh of electricity, a load factor of 9.6%. It sold essentially all of that volume outside EEG support — it is already merchant.
Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled. All Germany assets