Solar farm

Friedland Schwarzer Weg 23 Ausschreibung solar farm

Friedland Schwarzer Weg 23 Ausschreibung solar farm is a solar farm in Germany with a capacity of 3.5 MW, commissioned in 2022. It is operating and is owned by ST Solarinvestitionsgesellschaft Mecklenburg 2 mbH.

In 2024 it settled 2.5 GWh of electricity, a load factor of 8.1%. It sold essentially all of that volume outside EEG support — it is already merchant.

Measured performance vs peers
8.1%
This assetCohort median 9.7%Middle half

This asset produced at 8.1% of nameplate in 2024 — the 26th percentile of German solar commissioned 2020 or later (1,271 assets with metered output).

Capacity
3.5 MW
Country
Germany
Status
operating
Commissioned
2022
Owner
ST Solarinvestitionsgesellschaft Mecklenburg 2 mbH
Technology
PV
Measured output 2024
2.5 GWh
Load factor
8.1%
Peer percentile
26th
Grid connection
HS/MS
State
Mecklenburg-Vorpommern

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE959277827578); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets

←CapexAtlas|ScreenerMap