Solar farm

Forsthof solar farm

Forsthof solar farm is a solar farm in Germany with a capacity of 20 MW, commissioned in 2023. It is operating.

In 2024 it settled 13.2 GWh of electricity, a load factor of 7.5%. That volume was settled under EEG support.

Capacity
20 MW
Country
Germany
Status
operating
Commissioned
2023
Owner
Technology
PV
Measured output 2024
13.2 GWh
Load factor
7.5%

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled. All Germany assets

CapexAtlas|ScreenerMap