Solar farm

ENTEGRO Solarpark Grevel solar farm

ENTEGRO Solarpark Grevel solar farm is a solar farm in Germany with a capacity of 2.4 MW, commissioned in 2016. It is operating and is owned by ENTEGRO Solarpark Grevel.

In 2024 it settled 5.8 GWh of electricity, a load factor of 27.5%. Part of that volume was sold outside EEG support, so it is partly merchant.

Its EEG support ran to the end of 2020.

Measured performance vs peers
27.5%
This assetCohort median 10.0%Middle half

This asset produced at 27.5% of nameplate in 2024 — the 100th percentile of German solar commissioned 2015-2019 (635 assets with metered output).

Capacity
2.4 MW
Country
Germany
Status
operating
Commissioned
2016
Owner
ENTEGRO Solarpark Grevel
Technology
PV
Measured output 2024
5.8 GWh
Load factor
27.5%
EEG support ends
2020
Peer percentile
100th
Grid connection
MS
State
Nordrhein-Westfalen

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE938903141608); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets

←CapexAtlas|ScreenerMap