DreyerBantin. Gbr. solar farm

DreyerBantin. Gbr. solar farm is a solar farm in Germany with a capacity of 2.5 MW, commissioned in 2022. It is operating and is owned by Dreyer-Bantin GbR.

In 2024 it settled 2.3 GWh of electricity, a load factor of 10.6%. That volume was settled under EEG support.

Its EEG support runs to the end of 2042, after which that output is sold at market prices.

Measured performance vs peers
10.6%
This assetCohort median 9.7%Middle half

This asset produced at 10.6% of nameplate in 2024 — the 71st percentile of German solar commissioned 2020 or later (1,271 assets with metered output).

Capacity
2.5 MW
Country
Germany
Status
operating
Commissioned
2022
Owner
Dreyer-Bantin GbR
Technology
PV
Measured output 2024
2.3 GWh
Load factor
10.6%
EEG support ends
2042
Peer percentile
71st
Grid connection
MS
State
Mecklenburg-Vorpommern

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE992923690409); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets