Solar farm

CPV Leer Freiflächenanlage solar farm

CPV Leer Freiflächenanlage solar farm is a solar farm in Germany with a capacity of 3 MW, commissioned in 2012. It is operating and is owned by CPV Leer GmbH.

In 2024 it settled 2.7 GWh of electricity, a load factor of 10.2%. That volume was settled under EEG support.

Its EEG support runs to the end of 2032, after which that output is sold at market prices.

Measured performance vs peers
10.2%
This assetCohort median 10.5%Middle half

This asset produced at 10.2% of nameplate in 2024 — the 41st percentile of German solar commissioned 2010-2014 (2,063 assets with metered output).

Capacity
3 MW
Country
Germany
Status
operating
Commissioned
2012
Owner
CPV Leer GmbH
Technology
PV
Measured output 2024
2.7 GWh
Load factor
10.2%
EEG support ends
2032
Peer percentile
41st
Grid connection
MS
State
Niedersachsen

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE982835063743); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets