Solar farm

Boitzenburger Land solar farm

Boitzenburger Land solar farm is a solar farm in Germany with a capacity of 180 MW, commissioned in 2023. It is operating and is owned by Solarenergie Boitzenburger Land GmbH.

In 2024 it settled 130.1 GWh of electricity, a load factor of 8.3%. It sold essentially all of that volume outside EEG support — it is already merchant.

Measured performance vs peers
8.3%
This assetCohort median 9.7%Middle half

This asset produced at 8.3% of nameplate in 2024 — the 27th percentile of German solar commissioned 2020 or later (1,271 assets with metered output).

Capacity
180 MW
Country
Germany
Status
operating
Commissioned
2023
Owner
Solarenergie Boitzenburger Land GmbHresearched
Technology
PV
Measured output 2024
130.1 GWh
Load factor
8.3%
Peer percentile
27th
Grid connection
HS
ENTSO-E code
11W0-0000-0657-Q
State
Brandenburg

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against gp-joule.com (2024); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets