Allmannshofen solar farm is a solar farm in Germany with a capacity of 8 MW, commissioned in 2009. It is operating and is owned by S+S Solarfonds Allmannshofen GmbH & Co KG.
In 2024 it settled 7.6 GWh of electricity, a load factor of 10.9%. That volume was settled under EEG support.
Its EEG support runs to the end of 2029, after which that output is sold at market prices.
This asset produced at 10.9% of nameplate in 2024 — the 60th percentile of German solar commissioned pre-2010 (418 assets with metered output).
Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE977273296600); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets