Solar farm

Klettwitz Solar Park

Klettwitz Solar Park is a solar farm in Germany with a capacity of 90 MW, commissioned in 2022. It is operating and is owned by clearvise AG.

In 2024 it settled 92.2 GWh of electricity, a load factor of 11.7%. That volume was settled under EEG support.

Its EEG support runs to the end of 2042, after which that output is sold at market prices.

Measured performance vs peers
11.7%
This assetCohort median 9.7%Middle half

This asset produced at 11.7% of nameplate in 2024 — the 89th percentile of German solar commissioned 2020 or later (1,271 assets with metered output).

Capacity
90 MW
Country
Germany
Status
operating
Commissioned
2022
Owner
clearvise AGresearched
Technology
PV
Measured output 2024
92.2 GWh
Load factor
11.7%
EEG support ends
2042
Peer percentile
89th
Grid connection
HS
State
Brandenburg

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against gp-joule.com (2025); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets