Solar farm

Turnow-Preilack Solarpark

Turnow-Preilack Solarpark is a solar farm in Germany with a capacity of 54 MW, commissioned in 2009. It is operating and is owned by juwi.

In 2024 it settled 53.5 GWh of electricity, a load factor of 11.3%. That volume was settled under EEG support.

Its EEG support runs to the end of 2029, after which that output is sold at market prices.

Measured performance vs peers
11.3%
This assetCohort median 10.4%Middle half

This asset produced at 11.3% of nameplate in 2024 — the 74th percentile of German solar commissioned pre-2010 (418 assets with metered output).

Capacity
54 MW
Country
Germany
Status
operating
Commissioned
2009
Owner
juwiresearched
Technology
PV
Measured output 2024
53.5 GWh
Load factor
11.3%
EEG support ends
2029
Peer percentile
74th
Grid connection
HS
State
Brandenburg

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against gem.wiki; commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets